On the Inspection Setup Screen, scroll to the Asset area where you should see a Standpipe and Hose system listed (if not there, but on the building, you need to add it as an inspection item on the building)
Select the Standpipe and Hose system
When selected, "Include hose questions," defaults as selected and will send to the iPad
To not send hose information, uncheck the "Include hose questions" box
>>> Note: if "Include hose questions?" is unchecked and hose information is needed, then a new inspection will need to be issued with the box checked if the inspection has already been started
Comments
0 comments
Please sign in to leave a comment.