Marking an inspection complete is a manual process that can be done two ways
1. At the individual inspection level from the Inspection Detail Screen
2. From the Inspections tab by updating multiple inspections at once
From the Inspection Detail Screen
Locate the Inspection Status dropdown menu on the right side
From the status options, select Complete > Update
You will now see a success bar at the top of the screen confirming the status change
From the Inspections tab
How to change the inspection status for multiple inspections at one time
The linked documentation outlines how to change multiple inspection statuses at once - Follow the steps listed to change the statuses to Complete
Need help? Contact our Support Team at support@inspectpoint.com or submit a support ticket through the "Submit a request" link above.
Comments
0 comments
Please sign in to leave a comment.